| No. | Indicators | UOM | Specification | Remarks | ||
| Phase 1 | Phase 2 | Phase 3 | ||||
| A | Construction period | Year | 2018-2021 | 2021-2024 | 2024-2027 | 
 | 
| B | Proposed Installed capacity | MW | 2*300 | 2*600 | 2*600 | 
 | 
| 
					 |  |  |  |  |  |  | 
| 1 | Annual power supplu | X108kWh/a | 33 | 66 | 66 | 
 | 
| 2 | Anuual heat supply | GJ/a | 14543939 | 29087878 | 29087878 | 
 | 
| 3 | Water consumption per 1000 MW | m3/GWs | 0.0813 | 0.0813 | 0.0813 | 
 | 
| 4 | Coal burning index | Kcal | 5000+ | 5000+ | 5000+ | 
 | 
| 5 | Annual Coal consumption | 万吨 | 132 | 264 | 264 | 
 | 
| 6 | Annual water consumption | 万m3 | 3800 | 7600 | 7600 | 
 | 
| 7 | SO2 Emission concentration | Mg/Nm3 | 33.05 | 33.05 | 33.05 | |
| 8 | NOX Emission concentration | Mg/Nm3 | 52.5 | 52.5 | 52.5 | |
| 9 | Flue gas Emission concentration | Mg/Nm | 9.99 | 9.99 | 9.99 | 
 | 
| 10 | Ash content | 104t/a | 25.2 | 50.4 | 50.4 | 
 | 
| 11 | Desulphurization gypsum quanity | 104t/a | 5.42 | 10.84 | 10.84 | 
 | 
| 12 | Personnel | 人 | 232 | 464 | 464 | 
 | 
| 13 | Construction site area | 0000 m2 | 300 | 500 | 500 | 
 | 
| C | Construction time | Year | 4 | 4 | 4 | 
 | 
| 
					 |  |  |  |  |  |  |