Your Current Location:Investment > power plant

power plant

No. 

Indicators 

UOM 

Specification

Remarks 

Phase 1 

Phase 2 

Phase 3 

A

Construction period 

Year 

2018-2021

2021-2024

2024-2027

 

B

Proposed Installed capacity

MW

2*300

2*600

2*600

 








1

Annual power supplu

X108kWh/a

33

66

66

 

2

Anuual heat supply 

GJ/a

14543939

29087878

29087878

 

3

Water consumption per 1000 MW 

m3/GWs

0.0813

0.0813

0.0813

 

4

Coal burning index

Kcal

5000+

5000+

5000+

 

5

Annual Coal consumption 

万吨

132

264

264

 

6

Annual water consumption 

m3

3800

7600

7600

 

7

SO2 Emission concentration 

Mg/Nm3

33.05

33.05

33.05

8

NOX Emission concentration 

Mg/Nm3

52.5

52.5

52.5

9

Flue gas Emission concentration 

Mg/Nm

9.99

9.99

9.99

 

10

Ash content

104t/a

25.2

50.4

50.4

 

11

Desulphurization gypsum quanity

104t/a

5.42

10.84

10.84

 

12

Personnel 

232

464

464

 

13

Construction site area 

0000 m2

300

500

500

 

C

Construction time

Year

4

4

4